Skip to content

Latest commit

 

History

History
103 lines (82 loc) · 3.07 KB

312-swarm-janitors.md

File metadata and controls

103 lines (82 loc) · 3.07 KB
id title status lead-contributor contributors budget
Swarm Janitors
research
jarrad
nabil
oskar
hester
rachel
actual
xxx
estimate
yyy
currency
ETH

Swarm proposal

Summary and Goal(s)

The Status Janitors oversee the delivery and completion of the Status white paper by the end of Q1, with a hard deadline of the end of Q2 2019.

Communication

(required) status channel (same as swarm id): #312-janitors sync frequency: Weekly Sync, Monday 10am UTC

Meeting notes: https://notes.status.im/384OqZPUR1-viP7l2Fxeew?edit

Research

Completion by the 17th December (one week)

Goals of Specifications:

  • Swarm Framework
  • Define critical path for completing the swarm goal
    • SNT utility swarms
    • Identify essential non-SNT swarms (e.g. onboarding, product teams)
  • Report organisational progress regularly during Town Hall
  • Regular check-ins with swarms

Unknowns

  • Security audit timing
    • [NN] What do we want to audit? Our entire codebase? status-go and our smart contracts only? status-react? DApps should probably have their own securit audit (TN and DAO)
  • Launch (i.e. public app store) release scope
    • [NN] Can be determined once we see the critical path
    • [OT] Checking with Corey as well
  • Software for process management
    • Resource allocation to get swarm cost
    • Global view of state
    • Critical path
    • Monte Carlo simulations

Specification

Timeline 15th Jan to complete specifications of all > P2 features below. Swarm Framework: https://github.com/status-im/swarms SNT Utility Swarms:

  • Teller Network [P0] (Iuri and co + Wallet for hooks)
  • Tribute to Talk [P0] (Chat swarm)
    • Anti-spam [P2]
  • Sticker Market [P0] (Extensions)
  • Network Incentivisation [P1] (Core) -- [OT] With this, do we mean a possibly half-baked solution assuming the existing protocol? One concern would be if we change things around later on, but we can also provide this and clarify it isn't great and will likely be replaced. It depends on how much weight we put on ticking off boxes in whitepaper.
  • DApp store / Discover [P1] (Andy/DevRel)
  • User acquisition engine [P2]
  • Web of Trust / Trustlines [P3]

-- Get legal guidance on what is acceptable for completion of the White Paper --

Essential Swarms:

  1. DAO (Iuri and co)
  2. Onboarding/Patient Zero/Polish (Core/Relevant teams)
  3. Status Protocol (Oskar and co)

Team Structures

  • Core (Igor)
  • Chat (Eric)
  • Wallet (Goran)
  • DApp browser (Julien)
  • Desktop (?)
  • Keycard (Guy-Louis)

Implementation

Timeline:

  • Soft deadline - EOQ1 2019
  • Hard deadline - EOQ2 2019

All swarm contributors should test and break the implementation, especially developers

For above swarms to be in research phase: status-im#338

(required) document progress

(optional) townhall demo

Maintenance

lead-contributor,post-mortems

Copyright

Copyright and related rights waived via CC0.