Skip to content

Morango Integration Tests #14

Morango Integration Tests

Morango Integration Tests #14

Triggered via schedule October 13, 2024 00:01
Status Failure
Total duration 1m 10s
Artifacts
Path match check
4s
Path match check
Morango Integration Tests with PostgreSQL
46s
Morango Integration Tests with PostgreSQL
Matrix: Morango Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Morango Integration Tests (3.9)
Process completed with exit code 1.
Morango Integration Tests with PostgreSQL
Process completed with exit code 1.
Morango Integration Tests (3.6)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.6)
The operation was canceled.
Morango Integration Tests (3.11)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.11)
The operation was canceled.
Morango Integration Tests (3.8)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.8)
The operation was canceled.
Morango Integration Tests (3.7)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.7)
The operation was canceled.
Morango Integration Tests (3.10)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.10)
The operation was canceled.