This is a detailed breakdown of the simulation and optimization of the HS2 Train line from London to Birmingham

Notifications You must be signed in to change notification settings

Tobi-Ek/Simulation-and-Optimisation-of-HS2-Train-Line-From-London-to-Birmingham

Repository files navigation

SIMULATION-AND-OPTIMISATION-OF-HS2-LINE-FROM-LONDON-TO-BIRMINGHAM

Given certain constraints such that the average delay time should not be higher than half the scheduled time between consecutive trains, this paper focused on maximising the number of trains operating per hour. A detailed simulation is captured to reflect train trips from London Old Oak Commons to Birmingham Interchange station.

The simulated model in this paper factored in an induced temporary break down due to electrical malfunction with a 30-minute delay for fixing the problem as well as delay caused by random events and reports the distribution of the actual delayed times.

  • CA1-H9MSO_Project_Outline: This is the problem statement for the project
  • MSO_x19173105_Project_Code: This file contains the code developed for the simulation and optimisation problem
  • MSO_x19173105_Project_Output: This file presents the output of the simulation and optimisation solution

About

This is a detailed breakdown of the simulation and optimization of the HS2 Train line from London to Birmingham

Topics

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published