-
Notifications
You must be signed in to change notification settings - Fork 0
No labels!
There aren’t any labels for this repository quite yet.
41 labels
epic
epic
A feature idea that is large enough to require a sprint (5 days) or more and has smaller sub-issues.
external-dependency
external-dependency
Depends on an entity/dependency external to the team's control
merge-conflicts
merge-conflicts
The branch or pull request has merge conflicts with the target branch (e.g. master)
needs-design
needs-design
A feature idea that needs some interface design in order to be discussed/built.
please-test
please-test
Please test the feature in Staging Environment and confirm it's working as expected.
priority-2
priority-2
Second highest priority, should be worked on as soon as the Priority-1 issues are finished
priority-5
priority-5
Lowest priority. Don't work on issues with this label. Revisit these in future sprints as needed.