Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

move basic description to guide section #336

Open
wants to merge 2 commits into
base: main
Choose a base branch
from
Open
Show file tree
Hide file tree
Changes from 1 commit
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
32 changes: 32 additions & 0 deletions docs/guides/basics.mdx
Original file line number Diff line number Diff line change
@@ -0,0 +1,32 @@
---
sidebar_position: 2
---

# Wie funktioniert evcc? (Ein Blick ins Innere)

Wichtig für die Funktionalität ist ein Netzanschlusszähler (grid-meter). Dieser ermittelt die aktuelle Überschussleistung.
Die Messung der Erzeugungsleistung hat in diesem Fall keinen funktionalen Einfluss.
Ausnahme: https://docs.evcc.io/docs/guides/meters#ich-habe-eine-pv-anlage-aber-keinen-netzanschluss-z%C3%A4hler-kann-ich-evcc-trotzdem-nutzen

Die Überschussleistung wird mit der Mindestladeleistung verglichen. Ist diese erreicht, startet die Ladung.

Die Mindestladeleistung ergibt sich aus den im Loadpoint definierten Werten `minCurrent` und `phases` (https://docs.evcc.io/docs/reference/configuration/loadpoints

Beispiel: `phases: 1` und `minCurrent: 8`

1 (phases) x 8A (minCurrent) x 230V (Netzspannung) = 1840W (Mindestladeleistung)

## Manipulationsmöglichkeiten

Normalerweise entspricht die Überschussleistung der verfügbaren Ladeleistung. Die verfügbare Ladeleistung kann jedoch individuell durch mehrere Parameter verändert werden. Diese sind:

- Site: `residualpower`
- Site: `prioritySoc`
- Site: `bufferSoc`
- Site: `aux`
- Loadpoint: `enable: threshold`
- Loadpoint: `disable: threshold`

Die Einstellmöglichkeiten bitte der Beschreibung der jeweiligen Parameter entnehmen.

https://docs.evcc.io/docs/reference/configuration/site und https://docs.evcc.io/docs/reference/configuration/loadpoints
2 changes: 1 addition & 1 deletion docs/guides/charging.mdx
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
---
sidebar_position: 3
sidebar_position: 4
---

import SponsorshipRequired from "/docs/_sponsorship_required.mdx";
Expand Down
2 changes: 1 addition & 1 deletion docs/guides/faq.mdx
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
---
sidebar_position: 7
sidebar_position: 8
---

import SponsorshipRequired from "/docs/_sponsorship_required.mdx";
Expand Down
6 changes: 6 additions & 0 deletions docs/guides/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,6 +4,12 @@ sidebar_position: 1

# Tipps und FAQ

## Grundlagen

Hier gehts um die grundlegende Arbeitsweise von EVCC.
GrimmiMeloni marked this conversation as resolved.
Show resolved Hide resolved

[Weiterlesen...](basics)

## Konfiguration

Hier gehts um Themen der Einrichtung.
Expand Down
2 changes: 1 addition & 1 deletion docs/guides/meters.mdx
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
---
sidebar_position: 5
sidebar_position: 6
---

import SponsorshipRequired from "/docs/_sponsorship_required.mdx";
Expand Down
2 changes: 1 addition & 1 deletion docs/guides/setup.mdx
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
---
sidebar_position: 2
sidebar_position: 3
---

# Konfiguration
Expand Down
2 changes: 1 addition & 1 deletion docs/guides/vehicles.mdx
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
---
sidebar_position: 4
sidebar_position: 5
---

# Fahrzeuge
Expand Down
2 changes: 1 addition & 1 deletion docs/guides/wallbox.mdx
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
---
sidebar_position: 6
sidebar_position: 7
---

import SponsorshipRequired from "/docs/_sponsorship_required.mdx";
Expand Down
29 changes: 0 additions & 29 deletions docs/reference/configuration/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -52,35 +52,6 @@ graph TD;

```

### Wie funktioniert evcc? (Ein Blick ins Innere)

Wichtig für die Funktionalität ist ein Netzanschlusszähler (grid-meter). Dieser ermittelt die aktuelle Überschussleistung.
Die Messung der Erzeugungsleistung hat in diesem Fall keinen funktionalen Einfluss.
Ausnahme: https://docs.evcc.io/docs/guides/meters#ich-habe-eine-pv-anlage-aber-keinen-netzanschluss-z%C3%A4hler-kann-ich-evcc-trotzdem-nutzen

Die Überschussleistung wird mit der Mindestladeleistung verglichen. Ist diese erreicht, startet die Ladung.

Die Mindestladeleistung ergibt sich aus den im Loadpoint definierten Werten `minCurrent` und `phases` (https://docs.evcc.io/docs/reference/configuration/loadpoints

Beispiel: `phases: 1` und `minCurrent: 8`

1 (phases) x 8A (minCurrent) x 230V (Netzspannung) = 1840W (Mindestladeleistung)

#### Manipulationsmöglichkeiten

Normalerweise entspricht die Überschussleistung der verfügbaren Ladeleistung. Die verfügbare Ladeleistung kann jedoch individuell durch mehrere Parameter verändert werden. Diese sind:

- Site: `residualpower`
- Site: `prioritySoc`
- Site: `bufferSoc`
- Site: `aux`
- Loadpoint: `enable: threshold`
- Loadpoint: `disable: threshold`

Die Einstellmöglichkeiten bitte der Beschreibung der jeweiligen Parameter entnehmen.

https://docs.evcc.io/docs/reference/configuration/site und https://docs.evcc.io/docs/reference/configuration/loadpoints

### Site

Eine _Site_ beschreibt den Standort mit den vorhandenen und benötigten Geräten der Hausinstallation und ist für das Regeln der verfügbaren Leistung zuständig.
Expand Down