The project required the computation of the generation shift factors (GSF) based on a defined generator bus outage using the fast-decoupled XB version. The GSF values were used to approximate the post-contingency branch flows based on a pre-contingency branch flow and the generator output before the contingency. The AC power flows were compared …
1P1Q screening estimates the complex voltage V vector following a disturbance. This project considers either an outage if generator 2 or generator 3 , but not both, affecting the voltage. The program flow and algorithm is as follows